Proper VRV (Variable Refrigerant Volume) system design is critical to the performance, energy efficiency, and long-term reliability of your commercial HVAC installation. A poorly designed system can lead to capacity imbalances, comfort complaints, high energy use, or even early component failure.
Our team provides engineered VRV design services tailored to building type, usage patterns, and manufacturer specifications. This guide outlines key considerations in the design phase of a commercial VRV project.
Step 1: Define Building Requirements and Usage Patterns
Before any equipment is selected, a thorough analysis of the building’s characteristics and HVAC demands is required.
Data to Collect:
- Building size (square footage and number of floors)
- Occupancy levels by zone
- Internal heat loads (lighting, equipment)
- Window orientation and envelope insulation
- Peak heating/cooling loads by zone
- Operational schedule (24/7, business hours, etc.)
Why It Matters:
Zoning and equipment capacity must be matched precisely to avoid short cycling or underperformance.
Step 2: Zoning Strategy and Indoor Unit Selection
VRV systems allow for highly customizable zoning. Each zone should reflect a space with similar usage, thermal load, and schedule.
Common Commercial Zones:
- Open office areas
- Conference rooms
- Server or IT rooms
- Lobbies and atriums
- Restrooms or back-of-house areas
Selecting Indoor Units:
Choose the type and capacity of each indoor unit based on zone size, ceiling height, and aesthetics. Options include:
- Ceiling cassette
- Wall-mounted
- Concealed ducted (low-static or high-static)
- Floor-mounted or console units
Step 3: Outdoor Unit Sizing and Configuration
VRV outdoor units must be selected to match the total diversity of the building’s zones while leaving headroom for extreme conditions.
Key Concepts:
- Connected Capacity: Total capacity of all indoor units
- Diversity Ratio: The connected capacity divided by outdoor unit capacity (typically 120% max)
- Modular Installation: Outdoor units can be stacked or banked for large projects
Outdoor Unit Placement:
- Ensure proper airflow clearance
- Avoid direct sun exposure or exhaust recirculation
- Plan for refrigerant line lengths and elevation limits
Step 4: Piping Network Design
Refrigerant piping is one of the most critical aspects of a VRV system. Piping layout must follow manufacturer-specific rules for length, size, oil traps, and separation.
Best Practices:
- Use manufacturer software (e.g. Daikin D-Design, Mitsubishi Diamond System Builder)
- Follow maximum allowable pipe lengths
- Minimize elevation difference between indoor and outdoor units
- Plan for branch selector boxes in heat recovery systems
- Insulate both liquid and gas lines properly
Step 5: Control System Design and Integration
VRV systems offer a wide range of control options, from local room thermostats to centralized BMS integration.
Local vs Central Control:
- Local: Wall-mounted wired controllers per room
- Central: Touchscreen or web-based interfaces for all zones
Integration Considerations:
- Choose compatible BMS protocols (BACnet, Modbus, LonWorks)
- Set up remote monitoring and fault alerts
- Plan energy scheduling and demand response features
Step 6: Equipment Selection by Manufacturer
Each VRV manufacturer has different:
- Indoor/outdoor unit pairings
- Piping length allowances
- Control features
- Service tools
Design must follow the OEM’s official design manuals to ensure warranty compliance and peak performance.
Supported VRV Manufacturers:
- Daikin VRV IV/IV-S
- Mitsubishi City Multi
- LG Multi V
- Samsung DVM S
- Fujitsu Airstage
- Toshiba SMMS-e
Step 7: Compliance, Permits, and Energy Codes
VRV systems must meet local mechanical codes, refrigerant safety standards, and energy efficiency requirements.
Considerations:
- AHRI-rated system selection
- ASHRAE 15 and 34 compliance (refrigerant concentration limits)
- Title 24 (California) or IECC (international) standards
- Permit drawings and submittals for plan review
Step 8: VRV System Documentation and As-Builts
A complete design package should include:
- Load calculation reports
- Indoor/outdoor unit schedule
- Zone-by-zone layout
- Piping diagrams with elevation and distance
- Control wiring diagram
- Sequences of operation (SOO)